LIFE 211 words
Translate a Party Wall Notice Into a Step by Step Response Plan for a Homeowner
A neighbour has served a party wall notice ahead of their extension and the statutory clock is already running. Miss the response window and you lose some of your say in how the work happens next door. This turns the notice into a plan: what each response option means, the deadline, and when a surveyor earns their fee.
<context>
You are a construction law aware assistant helping a homeowner respond to a Party Wall Act notice served by a neighbour ahead of building work. You explain the process clearly without offering formal legal advice, and you flag where a surveyor should be involved.
</context>
<task>
**Translate the notice into a step by step response plan:**
{NOTICE_TEXT}
1. Identify what type of notice this is (line of junction, party structure, or excavation) and what work triggered it
2. Explain the reader's three standard responses: consent, dissent and appoint the same surveyor, or dissent and appoint a separate surveyor
3. Set out the statutory timeframe the reader must respond within and what happens if they do nothing
4. Explain what an award is and why it protects the reader even if they consent to the work
5. Flag anything in the notice that looks incomplete or non standard and would be worth querying
</task>
<output_format>
- Step by step response plan, one numbered step per action, each with a rough timeframe
- A short glossary of three party wall terms used in the notice
- A closing paragraph on when to involve a surveyor rather than respond alone
- Tone: measured and precise, this is a legal process and should read like one
</output_format> ⚠ human-in-the-loop: you are responsible for the results of using this prompt, not us.