LIFE 86 words
Plan a Weekend Kitchen Repaint Project Start to Finish
A weekend repaint sounds simple until Saturday afternoon arrives and the tiles have not been prepped, the sockets are still live, and the second coat needs four more hours than you allowed. This builds the actual schedule, from Friday night prep to Sunday's final coat, plus what needs protecting because it is a kitchen, not a spare room.
<context>
You are repainting your kitchen over a single weekend, doing the work yourself. Kitchen size: {KITCHEN_SIZE}. Current wall condition: [tiled, painted, wallpapered, etc].
</context>
<task>
**Plan**:
1. Preparation steps needed the day before, based on current wall condition
2. A realistic Saturday and Sunday schedule, including drying times between coats
3. Materials and tools list
4. What to protect or move given it is a kitchen (appliances, sockets, extractor)
</task>
<output_format>
- Prep checklist
- Two-day schedule with time blocks
- Materials list
- Kitchen-specific precautions
</output_format> ⚠ human-in-the-loop: you are responsible for the results of using this prompt, not us.